24-27 November: Domestic Roofing – Road Crossover
Published on November 19, 2024
As part of the construction works for the Central Baggage System (CBS), Lendlease will need to install roofsheeting to the road crossover.
Road Crossover Roofing Works:
- 8pm to 4am, 24/11/24 to 27/11/24 night-shift.
- As per the Traffic Guidance Scheme (TGS) below, the road crossover will be closed, and vehicles will be redirected to travel around the central pier using a contraflow system. During the roof installation process, five traffic controllers will be on site to effectively manage traffic flow.