17 September 2024: DTB SUP - Southern Loading Dock Exit - Auto Door Operator Installation

Published on September 13, 2024

Forming part of the Domestic Terminal Security Upgrade Project, the entire existing southern loading dock goods screening point will become a sterile space and require secured doors to maintain its security integrity.

To assist staff and tenants exiting with goods, trolleys and rubbish bins the double doors designating the sterile/landside exit point will be upgraded to an auto-opening door.

For further information please refer to the below Stakeholder Notice.